Date Ranges & Sets

Date Range Splitter

Divide an interval into smaller date ranges.

--
days

--

Business Days
0
Weekend Days
0
Weeks
0.0
Total Hours
0 h

How Date Range Splitter Works?

The Date Range Splitter works by cutting a range into consecutive smaller ranges of a chosen size, such as 7 days, 1 month or 30 days.

  1. 1

    Enter the range

    Pick the full start and end dates.

  2. 2

    Choose a chunk size

    Pick days, weeks or calendar months.

  3. 3

    Cut the range

    Each chunk starts the day after the previous chunk ends.

  4. 4

    Read the chunks

    The last chunk is shorter when the range does not divide evenly.

Date Range Splitter Formula

The Date Range Splitter formula is Chunk k = [Start + (k − 1) × S, min(End, Start + k × S − 1)].

Chunks = ⌈Total Days ÷ S⌉
Chunk k Start = Start + (k − 1)S
Chunk k End = min(End, Start + kS − 1)
S:
Chunk size in days
k:
Chunk number

Example: Splitting Jan 1, 2026–Mar 31, 2026 (90 days) into 14-day chunks gives 7 chunks: 6 full 14-day chunks and a final 6-day chunk.

Date Range Splitter Conversion Table

The table splits Jan 1, 2026–Mar 31, 2026 into 14-day chunks.

ChunkStartEndDays
1Jan 1, 2026Jan 14, 202614
2Jan 15, 2026Jan 28, 202614
3Jan 29, 2026Feb 11, 202614
4Feb 12, 2026Feb 25, 202614
5Feb 26, 2026Mar 11, 202614
6Mar 12, 2026Mar 25, 202614
7Mar 26, 2026Mar 31, 20266

What is Date Range Splitter?

A Date Range Splitter is a tool that divides a long date range into shorter consecutive ranges.

APIs, reports and billing systems often accept limited windows. A data export limited to 31 days per request needs a full year split into 12 monthly chunks.

Chunks never overlap and never leave gaps. Together they cover every date in the original range.

What are the uses of Date Range Splitter?

There are 5 main uses of the Date Range Splitter: API data pulls, billing periods, sprint plans, reporting windows and study blocks.

  • API data pulls

    Developers split a year into 30-day windows for API limits.

  • Billing periods

    Providers split a contract into monthly billing periods.

  • Sprint plans

    Teams split a quarter into 2-week sprints.

  • Reporting windows

    Analysts split a range into weekly report periods.

  • Study blocks

    Students split revision time into 7-day blocks.

Related Date Ranges & Sets Tools

View All 141 Tools →